Our Approach

Assurance that starts from the requirement, follows the manufacturing route and ends with evidence.

  1. Specification & planning
  2. Supplier manufacturing
  3. Inspection & FAT
  4. Shipyard installation
  5. Trials & commissioning
  6. Delivery

Start from the requirement

Every assignment begins with the documents that define what "right" means: contract, specification, drawings, rules and standards. From these we derive what must be verified, at which stage, and against which criterion. This becomes the inspection plan agreed with the customer.

Follow the product, not the paperwork

Records matter, but they describe the product; they are not the product. Our engineers verify physically, at the machine, in the block, in the engine room, and then check that the records say the same thing.

Report facts

A QUAY report separates what was measured or observed from what is concluded. It states the requirement, the result, and what was not inspected. Customers can forward it to their own customers without rewriting it.

Stay until closure

A finding has no value until it is closed. Open items are kept in a register with owner and date, and are verified on site before they are removed. See how an assignment runs and how we protect independence.