Marine Machinery & Propulsion

The propulsion train as a system: engine, gearbox, shafting, bearings and propeller working together.

Rotating element: balance, run-out and surface finish1Gear mesh: contact pattern and backlash2Shaft: dimensions, fits and material certificates3Flange coupling: bolt fits and alignment readings4Foundations: chocks, bolts and seating5
Illustrative process visualization

Propulsion machinery is supplied by several makers and assembled by the yard. Each component may pass its own shop test and the system can still fail on alignment, vibration or control interface. Inspection therefore covers both the components at the maker and their installation on board.

Inspection checkpoints

The numbers correspond to the checkpoints marked in the diagram above. Select a point in the diagram to jump to its explanation.

  1. Rotating element: balance, run-out and surface finishRotating parts are checked for residual unbalance against the specified balance grade, for run-out on bearing journals and sealing surfaces, and for surface finish where seals and bearings run. Small errors here return later as vibration, noise and seal wear.
  2. Gear mesh: contact pattern and backlashWith the gears marked, the contact pattern shows how the teeth actually carry load across face and flank. Backlash is measured and compared with the maker's range. A poor pattern at the maker never improves on board.
  3. Shaft: dimensions, fits and material certificatesJournal diameters, tapers and keyways are measured against tolerance, and interference fits are checked on both mating parts. Forging certificates and ultrasonic records are reviewed, since shafts are among the most highly stressed components on a vessel.
  4. Flange coupling: bolt fits and alignment readingsFitted bolts are checked for their hole fit, and coupling faces for run-out. Alignment is recorded as gap and sag or as bearing loads, compared with the calculation, and witnessed with the vessel afloat.
  5. Foundations: chocks, bolts and seatingChock thickness and contact, resin chock pour records, bolt elongation or torque, and seating flatness are verified. A soft foundation changes the alignment as soon as the machinery runs under load.

Typical documentation

Shop test records, torsional vibration calculation, alignment calculation and measurement records, material certificates, class certificates where required.

Related inspection and engineering services