Marine Testing, Trials & Commissioning
Witnessing and coordination of FAT, HAT, SAT and commissioning, the point where equipment and systems must prove they work as specified.
Tests are only as valuable as their procedure and the attention paid while they run. QUAY reviews test procedures beforehand, checks instruments and set-up, records data during the test and follows deficiencies to closure.
The scope runs from factory acceptance tests at the maker, through harbour acceptance tests and system commissioning alongside, to sea trials and final operational verification.
Key activities
- 01
Test procedure review and acceptance criteria check
A test proves only what its procedure asks. Before the test date we check that the procedure covers every requirement of the specification, that acceptance limits are stated as numbers, and that load steps, durations and safety provisions are defined. Open points are settled with the maker beforehand.
Marine Equipment FAT - 02
Instrument calibration and set-up verification
Measured values are only as reliable as the instruments. Ranges, calibration certificates and their validity are checked, together with the test arrangement itself: load bank capacity, sensor positions, pressure sources and safety devices. A test started on an unsuitable set-up is stopped rather than accepted.
Machinery Performance Testing - 03
Witnessing with independent data recording
The attending engineer records the readings personally at the agreed intervals instead of relying on a summary issued later. Observations that are not on the test sheet, such as leaks, noise, vibration or alarms, are noted with the time at which they occurred.
Sea Trials Coordination - 04
Deficiency lists and re-test follow-up
Each deficiency is written down with its reference, agreed with the maker or yard before leaving the test, and classified by whether it must be closed before shipment or delivery. Corrections are verified by re-test or inspection, not by a statement that the work has been done.
Functional & Operational Testing - 05
Commissioning status tracking by system
Commissioning is tracked system by system: pre-commissioning checks complete, maker attendance, function tests, settings recorded, outstanding items. The register shows at any time which systems are ready for harbour tests and which are holding the programme.
Commissioning Supervision
Services in this category
- Marine Equipment FAT
- Harbour Acceptance Tests
- Sea Trials Coordination
- Machinery Performance Testing
- Electrical System Testing
- Functional & Operational Testing
- Pressure & Leak Testing
- Commissioning Supervision
- System Integration Verification
- Final Operational Verification