Quality Assurance & Quality Control
The documents, records and methods used to plan and demonstrate quality.
Corrective and Preventive Action: the process of eliminating the cause of a detected non-conformity and preventing occurrence of potential ones.
First Article Inspection: complete verification of the first part produced by a new or changed process against all drawing requirements.
A stage in the ITP beyond which work must not proceed without the attendance or written release of the designated party.
Inspection and Test Plan: a table listing each inspection and test in the manufacturing sequence with its reference document, acceptance criteria, record and the attendance of each party.
Non-Conformance Report: a formal record of a product or process that does not meet a specified requirement, with its disposition.
A list of outstanding defects and incomplete items identified at an inspection or test, each to be corrected and closed before acceptance.
The ability to follow the history of a material or part through records, from the mill heat number to the finished, installed component.
A stage in the ITP where the designated party is notified and may attend; work may proceed if they do not attend after proper notice.