Maritime Project Management & Engineering

Owner-side project management and engineering coordination for vessels, yachts and marine equipment built in Türkiye, one accountable technical contact from contract to delivery.

0102030405 M1M3M5M7
Illustrative process visualization

A maritime project built far from the buyer's office is managed through documents, drawings and progress claims. QUAY places an engineer between those documents and the workshop floor: we plan against the contract, verify reported progress physically, and keep design, procurement and production moving in the same direction.

The work is structured around the contract specification, the building schedule and the agreed inspection regime. We do not replace the yard's or manufacturer's own project team; we give the customer an independent view of where the project really stands and what needs a decision.

Key activities

  1. 01

    Baseline schedule review and milestone definition

    We read the builder's programme against the contract dates and check its logic: are design approvals, long-lead equipment and production capacity really linked? Milestones are then defined in physical terms, such as a block erected or a system flushed, so that later nobody argues about whether one has been reached.

    Project Planning & Progress Monitoring
  2. 02

    Weekly physical progress verification against the programme

    Reported percentages are compared with what stands in the hall or on the berth. Each week the engineer walks the project, counts completed steps by discipline and records them with dated photographs. Differences between reported and observed progress are raised immediately, with the likely effect on delivery.

    Shipbuilding Project Management
  3. 03

    Design, class and owner comment tracking to closure

    Every comment from the designer, the classification society and the owner's team is logged with its drawing, revision and responsible party. We follow each item until the corrected drawing is issued and the change is visible in production, so that nothing agreed in a meeting is lost on the way to the workshop.

    Marine Engineering Coordination
  4. 04

    Change, variation and concession control

    Changes are where cost and delay enter a project. Each request is assessed for its technical effect, its knock-on effect on other systems, weight and class approval, and its price and time. Nothing is built until the change is approved and the workshop documents are updated.

    Engineering Change Management
  5. 05

    Structured reporting with photographs and open-item registers

    Reports follow a fixed structure: status against plan, critical items, quality findings, decisions required from the customer and an open-item register with owner and due date. Photographs are captioned and located, so a reader who has never visited the site can follow the project.