Marine Equipment & Manufacturing Inspection
Inspection of marine machinery, equipment and components at the manufacturer in Türkiye, in-process, final and at factory acceptance.
- 1Marine Machinery & Propulsion
- 2Pumps & Valves
- 3Hydraulic & Pneumatic Systems
- 4Electrical Systems & Switchboards
Marine equipment is expensive to correct once it has left the factory and even more so once it is installed on board. Inspection at the manufacturer, at the right stages, is the most economical point of control.
QUAY inspectors work from the purchase order, drawings, specification and the agreed inspection and test plan. Findings are recorded as measured, with a clear statement of conformity or non-conformity for each requirement checked.
Key activities
- 01
Incoming material and certificate verification
Material is checked before it is cut: grade, dimensions and heat number on the item are compared with the mill certificate and with the specification. Certificates are read for type, values and validity. Where traceability is required, marking transfer is verified so that identity survives cutting and machining.
Marine Equipment Inspection - 02
In-process inspection at defined hold and witness points
The inspection and test plan defines the stages where the buyer must release the work or may attend. We attend those points, typically fit-up, before closing, before coating and at pressure tests, and sign the plan only when the acceptance criterion for that stage is met.
In-Process Inspection - 03
Dimensional, visual and functional final inspection
At final inspection the finished item is compared with the order: critical and interface dimensions with calibrated instruments, surface condition and workmanship, nameplate and marking, then function as far as it can be shown. Results are recorded as measured values against tolerance, not only as pass or fail.
Mechanical Component Inspection - 04
Factory acceptance test witnessing
The test procedure is reviewed in advance, and instruments and their calibration are checked before the test begins. During the factory acceptance test each step is witnessed and data are recorded independently. Deviations are listed, agreed with the maker before leaving, and followed until re-tested.
Factory Acceptance Testing - 05
Packing, marking and preservation checks
Marine equipment often spends weeks at sea and months in a yard store before installation. Packing is checked for suitability, preservation of machined surfaces and openings, marking and handling instructions, and completeness of loose items, spare parts and documents.
Final Inspection
Services in this category
- Marine Equipment Inspection
- Machinery & Equipment Inspection
- Mechanical Component Inspection
- Electrical & Electronic Equipment Inspection
- Hydraulic & Pneumatic Equipment Inspection
- Marine Systems Inspection
- Manufacturing Process Inspection
- In-Process Inspection
- Final Inspection
- Factory Acceptance Testing