Maritime Quality Assurance & Technical Compliance

Independent quality assurance for maritime projects: verifying that specifications, drawings, materials, welding and documents meet what was contracted and what the rules require.

ITP HWR HEAT 4471 4471-03 EN 10204 3.1
Illustrative process visualization

Quality assurance works upstream of inspection. It asks whether the right requirements have been identified, whether the plan to verify them is adequate, and whether the evidence produced is genuine and complete.

QUAY reviews technical documents, inspection and test plans, material traceability and welding quality on behalf of the customer. Where non-destructive testing, laboratory testing or classification approval is required, these are performed by appropriately qualified and authorised parties; QUAY coordinates, witnesses and reviews the results.

Key activities

  1. 01

    Specification and drawing review against contract and rules

    Drawings and specifications are reviewed from the buyer's side: does the design comply with the contract specification and the referenced rules, are interfaces between disciplines consistent, can the item be built, accessed and maintained? Comments are issued on tracked sheets. Formal plan approval remains with the classification society.

    Drawing & Design Review
  2. 02

    Inspection and test plan review with hold and witness points

    A good inspection and test plan lists every critical activity with its reference document, acceptance criterion and record. We check coverage against the drawing and specification, set the customer's hold, witness and review points according to risk, and align them with class survey points to avoid duplicated attendance.

    Inspection & Test Plan Review
  3. 03

    Material certificate and traceability verification

    Certificates are compared with the specification for grade, values and certificate type, then with the material itself through heat numbers and marking. On finished components the chain is sampled backwards, from part to cutting record to plate and certificate, to confirm that traceability is real.

    Material & Traceability Verification
  4. 04

    Welding documentation and workmanship surveillance

    Welding cannot be fully verified afterwards, so control comes first: qualified procedures covering the joint, welders qualified for it, consumables correctly stored. During production, fit-up, preheat and parameters are checked against the procedure, and completed welds are examined visually against the specified quality level.

    Welding Quality Inspection
  5. 05

    Follow-up of classification comments and conditions

    Comments on drawings and remarks from surveys are kept in one register and followed with the builder until the society clears them. QUAY attends class surveys as the owner's representative. Approvals, survey decisions and certificates are issued solely by the classification society.

    Classification Requirements Follow-up

Services in this category

Industries served

QUAY provides independent technical assurance on the customer's behalf. Classification, statutory certification, certified NDT and accredited laboratory testing are performed by the authorised organisations; QUAY coordinates, witnesses and follows up. See Our Independence.