Shipbuilding & Yacht Construction Surveillance

Owner's surveillance of newbuildings and yacht construction in Turkish shipyards, from the first plate to sea trials and delivery.

0%25%50%75%100%
Illustrative process visualization

Turkish yards in Tuzla, Yalova, Antalya, Bodrum and İzmir build commercial vessels, workboats and yachts for owners around the world. Surveillance by an owner's representative ensures that what is hidden behind linings and paint has been seen and accepted by someone working for the buyer.

QUAY surveillance follows the building sequence: structure, coating, machinery, piping, electrical, outfitting, tests and trials. Statutory and class surveys remain with the flag administration and the classification society; our role is the owner's contractual and technical interest.

Key activities

  1. 01

    Hull structure, fit-up and weld inspection

    Structure is inspected while it can still be corrected economically: material marking, edge preparation, fit-up gaps and alignment before welding, then weld size, profile and surface defects after welding. The extent and results of non-destructive testing are reviewed, and key hull dimensions are checked at block and erection stage.

    Hull Fabrication Inspection
  2. 02

    Machinery, shafting and alignment witnessing

    Main engines, gearboxes and shafting are installed to the maker's instructions. We check foundations, chocks and holding-down bolts, witness alignment measurements, and record the readings as measured. Alignment is normally verified afloat, since the hull changes shape after launching.

    Machinery Installation Supervision
  3. 03

    Piping, electrical and automation installation checks

    Systems are checked against their diagrams: pipe material and supports, valve orientation and access, cable routing, segregation and penetration sealing, termination and earthing. Flushing, pressure tests and insulation tests are witnessed before the system is handed over for commissioning.

    Piping & Systems Installation Inspection
  4. 04

    Coating and outfitting quality surveillance

    Coating performance is decided by surface preparation and film thickness, so both are verified before the next coat hides them. In outfitting, many trades meet in confined spaces; inspections by compartment cover insulation, fire boundaries, closing appliances, access for maintenance and the standard of finish.

    Outfitting Inspection
  5. 05

    Trials attendance and delivery punch list

    Before trials, the programme is reviewed against the specification and readiness is confirmed. During harbour and sea trials the owner's results are recorded independently. Everything outstanding goes onto a punch list with a category, a responsible party and a date, and the list is verified item by item before delivery.

    Final Delivery Inspection

Services in this category

Industries served

QUAY provides independent technical assurance on the customer's behalf. Classification, statutory certification, certified NDT and accredited laboratory testing are performed by the authorised organisations; QUAY coordinates, witnesses and follows up. See Our Independence.