Maritime Supplier Quality Engineering

Supplier quality engineers working inside Turkish marine manufacturers on behalf of international buyers, preventing defects at source instead of finding them at receiving inspection.

0102030405 NCR / CAPA UCLLCL
Illustrative process visualization

Marine equipment buyers sourcing from Turkey typically need more than a final inspection. They need someone who understands the manufacturing route, can read the drawing the way the customer's engineers do, and can stay with a problem until its cause is removed.

QUAY provides supplier quality engineering as a resident or visiting service: process audits, first article inspections, control of non-conformities, corrective action follow-up and measured supplier performance.

Key activities

  1. 01

    Process audits against drawing, specification and control plan

    An audit follows the product through the plant, from incoming material to dispatch. At each operation we compare what the drawing, specification and control plan require with what the operator does and records. Special processes such as welding, heat treatment and coating are checked for qualified procedures, qualified people and calibrated equipment.

    Supplier Process Audits
  2. 02

    First article and in-process verification

    The first part off a new or changed process is measured completely, characteristic by characteristic, before series production is released. During production, sampling at defined operations confirms that the approved process is still the one in use and that results are not drifting towards the tolerance limits.

    First Article Inspection
  3. 03

    NCR handling with containment and root-cause analysis

    When a non-conformity is found, the first action is containment: affected parts are identified, counted and segregated, including stock already packed. The NCR states the requirement, the actual condition and the evidence. The supplier's root-cause analysis is then reviewed critically, because a wrong cause produces a useless corrective action.

    Non-Conformity Management
  4. 04

    Corrective action verification on the shop floor

    A corrective action is closed when it can be seen working, not when a form is signed. We verify on the shop floor that the change exists, that operators know it, and that parts from following lots are free of the defect. If the problem returns, the action is reopened.

    Corrective Action Follow-up
  5. 05

    Supplier scorecards based on agreed, measured criteria

    Indicators are agreed with the customer first, for example rejection rate at inspection, on-time delivery, NCR response time and repeat defects. Data come from recorded inspections and deliveries of the actual orders. The scorecard is reviewed with the supplier at set intervals and gives purchasing a factual basis for decisions.