First Article Inspection

Complete verification of the first production part or assembly against every drawing requirement before series production is released.

0102030405 NCR / CAPA UCLLCL
Illustrative process visualization

Scope of work

  • Ballooned drawing and full dimensional layout
  • Material, heat treatment and coating evidence review
  • Functional and fit checks where applicable
  • Review of the manufacturing route and tooling used

What you receive

First article inspection report with each characteristic recorded as measured, plus a release or reject recommendation.

Where this service fits

First Article Inspection is part of QUAY's Maritime Supplier Quality Engineering service line and is delivered on site in Türkiye for international customers. It is most often requested in Marine Equipment Manufacturing, Yacht Industry, Commercial Shipbuilding projects, and commonly concerns Pumps & Valves, Welding & Fabricated Components, Engines & Gearboxes.

Marine equipment buyers sourcing from Turkey typically need more than a final inspection. They need someone who understands the manufacturing route, can read the drawing the way the customer's engineers do, and can stay with a problem until its cause is removed.

Discuss this service